There are two governments involved in Lahore orange line project; one is Pakistan, and the second is China. This project was signed in May 2014, and its construction was started in October 2015. China’s government was granted 240820950000.00 Pakistan rupee or $1.55 billion for the metro orange line train project. This orange line train Pakistan is completed approximately in four years. Its testing and trial began in March 2020. The orange line metro train is only available in Lahore city out of the whole Pakistan.
How does the orange line train run in Lahore?
The metro orange line train Lahore contains 26 stations, out of which two stops are underground: Anar kali and central stations, and the remaining 24 are upper ground. Anarkali station is 16-meter-wide and Central Station 49.5 meters wide, while Elevated stations have a width of 22.5 meters. All elevated stations are 102 meters long; on the other hand, Anarkali and Central Stations are 121.5 and 161.6 meters long, respectively. The operation time of the Lahore orange line train is 7:30 am to 8:30 pm. The orange line train fare is 40 R.s per passenger.
What time does the Orange Line train start running?
The timing of metro orange line train Lahore is very suitable, its start at 7:30am to 8:30pm.
How much the speed of orange line train?
The maximum speed of Lahore orange line train is 80km per hour.